Major renovation or extension
Substantial structural work may require construction-style progress funding rather than a standard equity release or renovation loan.
Property Finance
Finance for renovations, new homes, knockdown rebuilds, property developments and commercial construction projects.
Last reviewed
Construction finance is not one single type of loan. It can range from funding a major renovation or a new family home through to financing a duplex, townhouse project, apartment development, industrial building or commercial construction project.
The common feature is that the lender is financing something that is being created or substantially changed. Unlike an ordinary property purchase, the finished asset may not exist when the loan is approved. That changes how the lender looks at valuation, construction costs, the builder, the contract, project timing and the way money is released.
For a typical residential build, funds are usually released progressively as defined stages of construction are completed. For larger development and commercial projects, drawdowns can be more tightly controlled and the lender may assess the feasibility, sponsor contribution, project team, presales, end value, contingency and exit strategy as well as the construction itself.
The appropriate finance structure depends on the scale of the works, property type, borrower, builder, intended outcome and lender policy.
Substantial structural work may require construction-style progress funding rather than a standard equity release or renovation loan.
The lender can consider land value, building contract, builder, plans, approvals, borrower contribution and the proposed completed value.
Existing debt, demolition, temporary accommodation, land equity, construction timing and the completed valuation all need to work together.
Residential construction mechanics apply alongside investor serviceability, rental-income treatment and investment loan structure.
These projects can sit between ordinary residential construction and development finance depending on scale, title, borrower experience and whether the properties will be sold or retained.
Larger residential, commercial and industrial projects are generally assessed as project-specific development finance with more extensive due diligence and drawdown control.
A residential construction loan is generally structured so the lender releases construction funds in stages instead of providing the full amount upfront. These stage payments are commonly described as progress payments.
The exact names and number of stages depend on the builder, contract and lender. The builder issues a claim when an agreed stage has been completed, and the lender may require the borrower to approve it and may arrange an inspection or request other evidence before payment.
Because the construction component is progressively drawn, many construction loans calculate interest on the amount that has actually been drawn during construction. At completion, the loan normally moves to the repayment structure agreed with the lender.
The exact process varies by lender and building contract, but a residential construction facility commonly follows these steps.
Prepare the plans, specifications, required approvals and an acceptable building contract.
The lender assesses the borrower, land or existing property, builder, contract, proposed costs and lending structure.
A construction valuation can assess the land and proposed improvements on an 'as if complete' basis.
Once the lender's conditions are satisfied, the construction facility becomes available for approved drawdowns.
Cash or equity contributions may need to be used before or alongside lender-funded progress payments, depending on the structure.
The builder completes an agreed stage and issues a progress claim or invoice.
The borrower confirms the claim and the lender may require documents, valuation evidence or an inspection before releasing the approved amount.
At final completion the lender may require a final inspection or valuation, insurance and relevant occupancy or completion documents.
These are common examples only. The building contract and lender requirements determine the actual payment schedule.
| Comparison | Stage | What it generally represents |
|---|---|---|
| Base / slab | Base / slab | Site preparation, foundations or slab and associated initial works. |
| Frame | Frame | The structural frame or skeleton of the building. |
| Lock-up | Lock-up | External walls, roof, windows and doors sufficiently completed for the building to be secured. |
| Fixing / fit-out | Fixing / fit-out | Internal fixtures, services and finishes progressing toward completion. |
| Completion | Completion | Final works completed, subject to lender requirements such as inspection, valuation, insurance and relevant occupancy documentation. |
The builder generally issues a progress claim or invoice after completing an agreed stage. The borrower submits the required payment request and the lender may verify the stage before releasing the approved payment.
The lender is not simply paying every invoice automatically. It needs to remain comfortable that the work is progressing, the claim is consistent with the approved contract and there will be enough funding left to complete the project.
For residential builds, the process then repeats until completion. For larger developments, progress drawdowns can be supported by quantity-surveyor or other project-monitoring reports and may be tied closely to the approved budget and cost-to-complete position.
There is no single construction-loan deposit that applies to every project. The lender considers the value of the land or existing property, construction cost, completed value, borrower contribution, proposed loan amount and the overall loan-to-value ratio.
If you already own the land or have substantial equity in the property being renovated or rebuilt, that equity may form part of the contribution. If land is being purchased at the same time as the build, the land settlement and construction facility may need to be assessed together.
Available equity does not automatically mean sufficient borrowing capacity. The borrower must still satisfy the lender's serviceability and other credit requirements.
The lender is not simply financing the total of the builder's invoices. It also needs to be comfortable with the value of the property when construction is complete.
A construction valuation commonly considers the land and proposed improvements using the plans, specifications, building contract and comparable property evidence. If the lender's completed-value assessment is lower than expected, the effective LVR can increase and the borrower may need to contribute more funds or change the structure.
A higher construction cost does not automatically create an equivalent increase in market value. Highly customised finishes, overcapitalisation or changes with limited market value can create a gap between cost and valuation.
Variations are common during construction, but they can create a finance problem if they increase the cost without an agreed funding source. Borrowers should not assume the lender will automatically increase the loan for a variation.
Before agreeing to a material change, it is sensible to confirm whether it will be funded from cash, contingency or additional approved lending and whether the lender needs updated plans, valuations or contract documents.
Construction projects can also encounter site conditions, engineering issues, delays, specification changes and additional work. A funding plan that assumes the original contract price is the absolute maximum leaves little room for error. A realistic contingency or cash buffer can make an important difference.
Not every renovation needs a construction loan. A kitchen replacement, cosmetic renovation or smaller project may be funded through savings, redraw, an equity release or another suitable loan structure.
Construction-style finance becomes more relevant when the work is structural, substantial or staged — for example a major extension, second storey or extensive renovation under a building contract. The lender may want progress payments and a completed-value assessment because the security is changing materially during the works.
The appropriate structure depends on the scale of the renovation, available equity, contract, builder, serviceability and lender policy.
A knockdown/rebuild combines an existing property, demolition and new construction. If there is already a mortgage over the property, the lender needs to remain comfortable with its security while the existing dwelling is removed and the new home is built.
The finance plan should allow for demolition, site works, the building contract, temporary accommodation, insurance, timing and contingency. The lender will generally focus on the land value, the completed-property valuation and the borrower's capacity to meet the lending requirements throughout the build.
Planning the finance before signing the demolition and building contracts can prevent avoidable delays.
Construction delays can extend the period before the loan converts to its post-construction repayment structure and can increase holding, rent or temporary accommodation costs. Lenders may also have time limits within which construction must start and finish.
Builder insolvency is more serious. The lender may need to understand the completed works, remaining cost to complete, replacement-builder contract, insurance position and whether the existing approval remains adequate. Additional borrower funds may be required. Because the response depends on the contract, insurance and lender, legal and finance advice should be obtained promptly.
Once a project moves into multiple dwellings, subdivision, build-to-sell activity or commercial development, the lender's analysis can become substantially more project-focused.
| Comparison | Residential construction | Development / commercial construction |
|---|---|---|
| Borrower | Usually homeowner or individual investor. | Developer, investor, business or project entity. |
| Core assessment | Building contract and completed-home valuation. | Development feasibility, cost plan and end-value assessment. |
| Drawdowns | Progress payments at standard build stages. | Controlled drawdowns tied to cost-to-complete and project evidence. |
| Repayment capacity | Personal serviceability is central. | Sponsor strength plus project feasibility and exit can be central. |
| Project team | Builder and contract assessment. | Builder, developer, consultants and project experience may be assessed. |
| Documentation | Standard documentation can be relatively contained. | More extensive legal, valuation, QS and project-control documentation. |
For multiple dwellings, subdivision, build-to-sell activity or commercial development, the lender may assess not only the borrower or sponsor but also the development feasibility, planning position, project team, builder, construction contract, contingency, presales where relevant, valuation, cost to complete and the proposed exit strategy.
A project that looks profitable on paper can still be difficult to finance if the developer contribution is insufficient, costs are uncertain, approvals are incomplete or the lender is not comfortable with the end-value or sales assumptions.
The overall cost of delivering the project, which can include land, construction, professional fees, statutory costs, finance costs, contingency and other project expenses.
The development loan expressed as a percentage of the lender-recognised development cost. What counts as eligible cost and the acceptable ratio are lender-specific.
The lender's assessed value of the completed project or expected gross realisation from sales. Assumptions can vary between lenders and valuers.
The cash, equity or value contributed by the developer before and during the project. The required contribution varies by risk, scale and lender.
Contracts to sell proposed dwellings before completion. Some lenders may require acceptable presales while others may rely more heavily on equity, location, developer strength or another exit.
A QS or project monitor may review the budget, certify progress and report whether the remaining undrawn facility is sufficient to complete the project.
How the construction facility will be repaid — commonly through sales, refinance into investment or commercial debt, business cash flow or another supported repayment source.
Development facilities are generally not intended to provide unrestricted access to the full approved construction amount. Drawdowns are commonly linked to certified construction progress, the approved budget and the lender's cost-to-complete position.
A quantity surveyor or other project monitor may review the builder claim, actual work completed, remaining contingency and forecast cost to complete before the lender releases the next drawdown. The developer may also need to contribute agreed equity before or alongside lender funds.
This control is designed to reduce the risk that the facility is exhausted before the project is complete.
Commercial construction can include warehouses, offices, retail, industrial facilities, medical premises, mixed-use buildings and other specialised projects. Finance is usually tailored to the project rather than treated as a standard residential product.
The lender can consider the construction contract, tenant or leasing strategy, pre-commitments, developer or business financial strength, end value, interest cover and the intended repayment or refinance at completion.
The exact requirements vary materially by project and lender.
Identification and income documents, land or property information, current debt, plans and specifications, building contract, approvals, builder details, budget, borrower contribution evidence, valuation and progress claims.
Feasibility, planning approvals, cost plan, valuation, builder contract, quantity-surveyor reports where required, presales where applicable, sponsor or developer information, financial information and the proposed exit strategy.
A residential construction loan usually releases funds progressively as approved building stages are completed rather than advancing the full construction amount upfront. The exact drawdown, inspection and repayment rules vary by lender.
The builder generally issues an invoice or progress claim after completing an agreed stage. The borrower submits the required request and the lender may verify the stage before releasing the approved payment.
Many residential construction loans calculate interest on the amount already drawn during construction rather than the full undrawn approved facility. The specific lender terms should always be checked.
There is no universal deposit. The lender considers land value, existing equity, construction cost, completed value, loan amount, borrower contribution and serviceability.
Potentially. Construction-style funding can suit substantial or structural renovations and extensions, particularly where the work is staged under an acceptable building contract.
Potentially. The lender must remain comfortable with the security while the existing dwelling is demolished and the new property is constructed. Demolition, temporary accommodation, valuation and contract timing all need to be considered.
Common documents include plans, specifications, building contract, approvals, builder information, construction budget, valuation and normal borrower income and identification documents. Requirements vary by lender and project.
The additional cost may need to be funded from contingency, borrower cash or approved additional lending. A late funding shortfall can be difficult to solve, so contingency should be considered before construction starts.
A lower valuation can increase the LVR and create a borrower-contribution shortfall. Construction cost is not automatically the same as completed market value.
Delays can increase holding costs and may run into lender time limits. If the builder becomes insolvent, the lender may need to reassess the remaining works, replacement builder, insurance position and cost to complete. Legal and finance advice should be obtained promptly.
Sometimes, but lender choice can be more limited and requirements can be substantially stricter than for a licensed builder under a standard contract.
Potentially. A duplex can sometimes fit residential construction policy, while larger multi-dwelling townhouse projects are commonly assessed as development finance. The structure depends on titles, scale, borrower experience and whether the properties will be sold or retained.
Development finance is generally more project-focused. The lender can assess feasibility, developer contribution, end value, project team, approvals, cost to complete, presales where relevant and the exit strategy as well as construction itself.
Sometimes, but there is no universal presale requirement. It depends on the lender, project size, location, product type, developer strength, equity contribution and market conditions.
A quantity surveyor can review the construction budget, confirm progress, assess variations and report whether the remaining undrawn facility is sufficient to complete the project.
Construction finance is often less about selecting a product and more about matching the project to a lender whose policy and process fit the build. My role is to understand the project, available equity, borrower or developer position, contract and proposed outcome; identify suitable lending pathways; explain the drawdown requirements; and coordinate the finance through approval and construction.
For larger developments, this can also involve working alongside valuers, quantity surveyors, accountants, solicitors and other project advisers.
Residential construction loan and progress-payment information.
Residential construction lending information.
Residential construction lending information.
General information about interest-only repayments.
Property and development finance information.
Commercial property and development finance information.